Product Description

Steel rail, also known as railroad track or railway track, is a vital component of railway infrastructure that supports and guides railway vehicles, such as trains, trams, and subway cars. Steel rail provides a smooth, stable surface for trains to travel on, ensuring safe and efficient transportation of passengers and freight.

 

Key components of steel rail include:

 

Rail Head: The top surface of the rail, which makes contact with the train wheels. It is designed to provide a smooth rolling surface and withstand the repeated impact and friction from train wheels.

 

Rail Web: The vertical section of the rail that connects the rail head to the rail base. It provides structural support and distributes the load from the train wheels to the rail base.

 

Rail Base: The bottom portion of the rail that rests on the railway ties (sleepers) and distributes the load to the underlying ballast or track bed. It provides stability and prevents the rail from shifting or tilting.

 

Rail Flange: The raised edge on the inner side of the rail head, which helps guide the train wheels and prevents them from derailing.

 

Shangang Metal Group Co., Ltd. continuously meets customers’ requirement.We also supply customized service. Shangang Metal Group Co., Ltd. strives to build long-term relationship with all of partners and provide products with prime quality and competitive price.More details, feel free to contact us.

 

Steel Rail
SizeDimension(mm)Weight
(kg/m)
MaterialLength(m)
Head(mm)Height(mm)Bottom(mm)Web(mm)
GB6KG25.450.850.84.765.98Q235B6-12
GB9KG32.163.563.55.98.94Q235B6-12
GB12KG38.169.8569.857.5412.2Q235B/55Q6-12
GB15KG42.8679.3779.378.3315.2Q235B/55Q6-12
GB22KG50.393.6693.6610.7223.3Q235B/55Q6-12
GB30KG60.33107.95107.9512.330.1Q235B/55Q6-12
Standard: YB222-63
8KG25655478.42Q235B6-12
18KG4090801018.06Q235B/55Q6-12
24KG511079210.924.46Q235B/55Q6-12


Product Display

下载 (13).jpg

Customer Visit

Customer Reviews

FAQ

Q1: What's your terms of payment? 
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance. 

Q2: What's the terms of delivery? 
A: EXW, FOB, CFR, CIF 

Q3: What's the terms of packing? 
A:Generally,we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.

Q4: What's your delivery time? 
A: For stocks, we could transport the goods to loading port within 7 work days after we received the deposit. For production period, it usually takes about 15 days to 30 days after we received the deposit. 

Q5: Could you produce according to the samples? 
A: Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.

Q6: Could you provide the compliment samples? 
A: Yes, we could provide the free samples on condition that it is available in stocks, however,the transportation fee is borne by buyer. 

Q7: How could you guarantee your products quality? 
A: Each piece of products is manufactured by certified workshops, inspected by us piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality. 

Q8: Are you a factory?
A:  is a large trading and manufacturing company with 20 branches, and is the benchmark for steel industry exports.

Online Consultation

Submit

Related Suggestion